top of page
sulzer-chemtech-process-solutions-logo.png

Sulzer InTecH

Validate. Optimize. Scale with confidence.

Sulzer innovation technology hubs (InTecH) help customers validate, optimize, and scale new technologies through laboratory and pilot-scale testing. Our global network of innovation centers combines advanced infrastructure with process expertise to reduce scale-up risk and accelerate commercialization.

Why pilot testing matters

Laboratory results do not always translate directly to commercial-scale performance.

Feed variability, impurities, operating conditions, and scale-dependent effects can significantly impact process efficiency and product quality. InTecH enables customers to validate process performance using their own feedstocks and operating conditions before making critical investment and scale-up decisions.

Multidisciplinary process expertise

Covering polymers, separations, thermal processes and sustainability, we support hybrid process solutions.

Reduce scale-up risk

Pilot testing with real process feed generates reliable performance data and minimizes technical and financial uncertainties.

Accelerate time-to-market

Flexible pilot systems and integrated analytics shorten development cycles and support faster commercialization/industrialization

01

Lab Research

Concept design and feasibility studies

02

Pilot validation

Evaluate performance using real feedstocks under representative operating conditions

03

Process optimization

Refine process design and optimize performance

04

Industrial deployment

Scale with confidence using validated performance data

From laboratory success to industrial scale

Our pilot centers bridge the gap between laboratory results and commercial-scale performance. Combining advanced pilot infrastructure, analytical capabilities, and engineering expertise, we help customers transform promising concepts into reliable, scalable industrial solutions.

banner-form-without-text (1).webp

Do you need pilot testing ?

Answer these questions to determine whether pilot testing is right for your application.

What is the primary objective of your pilot trial?
Proof of concept (feasibility study)
Process optimization (improving yield/purity of existing process)
Collecting operating parameters for industrial plant design
Resolving specific operational or performance issues

Proven infrastructure

Advanced analytics

Engineering expertise

Data-driven decisions

Scalable solutions

Chemical processes and advanced solutions

We combine separation science, solvent development, and specialty chemical process engineering to solve complex chemical and thermal challenges. Our expertise enables customers to develop efficient, scalable, and economically viable process solutions.

What we do

Separation and Purification technologies

Reaction and Process development

Solvent screening and optimization

Distillation, extraction and crystallization

Pilot testing under real operating conditions

Sustainable materials and recycling

We develop processes for producing sustainable materials for tailored market applications and recycling solutions that are ready for industrial implementation. 

What we do

Mechanical and chemical recycling

Polymer reprocessing

Melt filtration and purification 

Recycled-content optimization

Circular economy pilot programs

Materials & product innovation

We connect polymer chemistry, mass transfer and crystallization technologies with process engineering to translate innovation into scalable industrial applications, reducing risk and enabling efficient, economically viable production at commercial scale.

What we do

Polymer synthesis and formulation

Biopolymer development

Compounding and reactive extrusion

Material characterization and analytics

Product performance validation

Sulzer InTecH areas of expertise

Our global innovation centers

sulzer-intech-test-center-location.webp
  • The duration depends on the process complexity and scope. A standard feasibility test usually takes 1 to 2 weeks, including preparation, onsite operation, and data analysis. We define the specific timeline during the initial project planning phase to align with your production schedule and development goals.

  • Yes. Testing with your actual feed streams is essential for reliable scale-up. We provide detailed guidelines on how to ship, handle, and store your materials safely. If your material is hazardous or sensitive, our experts will coordinate with you to ensure full compliance with safety protocols.

  • You will receive a comprehensive technical report including process performance data, mass balance calculations, and specific recommendations for industrial scale-up. This report provides the validated parameters needed to move forward with equipment design and investment planning with confidence.

  • Pilot testing de-risks your investment by validating process performance and energy efficiency before full-scale deployment. By identifying potential bottlenecks and optimizing operating parameters in a controlled environment, we ensure that your industrial installation meets its performance guarantees, preventing costly design corrections later.

  • Lab-scale testing is used for initial proof of concept and defining basic physical properties. Pilot-scale testing uses larger equipment to simulate continuous industrial operating conditions. Pilot trials are crucial for generating the reliable, high-fidelity data required to finalize the design of full-scale production units.

Contact an expert

Our technical specialists are ready to help you find the optimal distillation solution for your specific application

Vitor Lacerda Mauricio

Head of pilot plant operations

Suburban House
Contact us

Get detailed technical information and project consultation

150+ Years Experience

Proven track record in chemical process engineering and equipment manufacturing.

Global Presence

Worldwide support network with local expertise and rapid response capabilities.

Quality Assurance

ISO certified processes and rigorous quality control for reliable, safe operations.

Ready to validate your process with confidence?

Why choose Sulzer ?

bottom of page